There were 322 press releases posted in the last 24 hours and 396,937 in the last 365 days.

Plan for single-lane-alternating traffic on Highway 7 near Mission

CANADA, July 17 - Print

British Columbia News

https://news.gov.bc.ca/31303

Drivers are advised of an upcoming lane closure on Highway 7 between Murray Street and Stave Lake Street as construction continues to improve the commercial truck route through Mission.

Highway 7 will be reduced to single-lane-alternating traffic between Murray and Stave Lake streets from 7:30 p.m. Friday, July 19, through 5 a.m., Monday, July 22, 2024.

The work is necessary to stabilize the slope on the bank below the highway. The complexity of the project requires this lane closure over multiple days. A construction-zone speed limit will be in effect and drivers must obey all signage and traffic control personnel.

Drivers can expect delays and should plan extra time or choose an alternative route.

For updates, check: https://www.drivebc.ca/

https://news.gov.bc.ca/31303

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.